| • I am a supervisor engineer and project manager for Water supply project, hospital, water tight structure, Engineering consultant, retaining wall design, open channel.
• Working at Iraqi officials & contractors rebuild infrastructure project as a Quality Control engineer at new water treatment plant in Al-SADR City in Baghdad for 7 months.
• Working in governmental Company in Water Projects Field & (Ground Concrete Reservoir implementation) in a form of Contract As:
• A Resident Engineer, Project manager, Site Engineer & Surveyor Engineer (20/1/2002 – 20/11/2005).
• Workings as a supervisor Engineer in execute of Strip or raft footings and deep foundation by using (Precast, board & cast in situe “Franki piles” concrete piles.
• Working as a civil Engineer in a private bureau (2001-2003).
• I work also As trainer Engineer for Increasing Computer Skills and project management and GIS trainings of the Employees of local departments.
• I work as official employee in Kufa University as Assistant Lecturer from Dec.2005 till this date and consultant Engineer in New college Buildings during 2007 ,2008,2009 and 2010.
• I Attended and successfully completed Twelve hours training of three Phase inspection, Construction quality control.
• I Attended and successfully completed eight hours Safety Training.
• Workings as a supervisor Engineer in execute of local multistory in Baghdad.
• As a maintenance Engineer in a private computer bureau.
• Participating of the most conferences which held during the last two years in Najaf Province and I have Recommendation of all these conference.
• Giving training courses in both AutoCAD and GIS programs and Quality Control and Quantity Estimate at different times.
| ||||||||||||||||
| ||||||||||||||||